No. |
Contracts Undertaken |
Client |
Contract Duration |
Contract Location / Country |
|
Start Date |
End Date |
||||
1 |
Protection Relays Calibration, Testing and Co-Ordination for Electrical Power Grid of Fula Oilfield for 33KV switchgear part and 11KV switchgear part of CPF Power Plant system: ● Protection Relay Test ● Primary Equipment Test ● Protection Setting Coordination ● Test Reports |
Petro-Energy |
Mar., 2012 |
Apr., 2012 |
Sudan |
2 |
Protection Relays (33KV&11KV) Calibration, Testing and Co-Ordination for Electrical Power Grid In CPF and 4 FPF Protection Relay Test and Primary equipment test ● External and Internal Check ● Insulation and Resistance Test ● Input and output Test of protection relay ● A/D conversion system Test ● Test of the relay logic ● Group Test ● System Test |
Petro-Energy |
Jun., 2012 |
Jul., 2012 |
Sudan |
3 |
Doing Dynamic Balancing of 2 Sets ABB Type TPS 61 EV2 Turbocharger Unit Complete overhauling, renew bearings and sealing sets, rotors (cartridge) cleaning, cartridge dynamic balancing, etc. including ● Complete strip down of the turbochargers. ● Rotors (Cartridge cleaning) ● Cartridge dynamic balancing ● Renew bearings and sealing sets ● Overall reassembling. |
Petro-Energy |
May, 2012 |
Jun., 2012 |
Sudan |
4 |
Provision of Engineering Service for Transmission Line & Power System Upgrading Project Engineering services for Lot 1~Lot 4,including: ● Lot 1 33 kV Outdoor CB ● Lot 2 Reclosers ● Lot 3 Ring Main ● Lot 4 Shunt Reactors |
GNPOC RAM |
Mar., 2011 |
Jun., 2011 |
Sudan |
5 |
Repair and calibration of Fighting System in CPF power plant Supply, Delivery, Installation support and Commissioning for: ● Fighting System |
Petro-Energy |
Apr., 2013 |
Apr., 2013 |
Sudan |
6 |
Provision of inspection, testing and calibration for protection relay inspection, testing and calibration for protection relay system including: ● Pumping station 2 ● Pumping station 3&4&5&6(Typical) ● Marine Terminal(6.6 KV SWGR/ 400V SWGR/MCC) |
PDOC |
Dec., 2014 |
Mar., 2015 |
Sudan |
7 |
Provision of New Installation, Check, Test& Replace of the Lightning Protection System of the 33&11KV OHTL |
Petro-Energy/ CPECC |
Jul., 2014 |
Sep., 2014 |
Sudan |