Technical Service & Support

No.

Contracts Undertaken

Client

Contract Duration

Contract Location / Country

Start Date

End Date

1

Protection Relays Calibration, Testing and Co-Ordination for Electrical Power Grid of Fula Oilfield

for 33KV switchgear part and 11KV switchgear part of CPF Power Plant system:

● Protection Relay Test

● Primary Equipment Test

● Protection Setting Coordination

● Test Reports

Petro-Energy

Mar., 2012

Apr., 2012

Sudan

2

Protection Relays (33KV&11KV) Calibration, Testing and Co-Ordination for Electrical Power Grid In CPF and 4 FPF

Protection Relay Test and Primary equipment test

● External and Internal Check

● Insulation and Resistance Test

● Input and output Test of protection relay

● A/D conversion system Test

● Test of the relay logic

● Group Test

● System Test

Petro-Energy

Jun., 2012

Jul., 2012

Sudan

3

Doing Dynamic Balancing of 2 Sets ABB Type TPS 61 EV2 Turbocharger Unit

Complete overhauling, renew bearings and sealing sets, rotors (cartridge) cleaning, cartridge dynamic balancing, etc. including

● Complete strip down of the turbochargers.

● Rotors (Cartridge cleaning)

● Cartridge dynamic balancing

● Renew bearings and sealing sets

● Overall reassembling.

Petro-Energy

May, 2012

Jun., 2012

Sudan

4

Provision of  Engineering Service for Transmission Line & Power System Upgrading Project

Engineering services for Lot 1~Lot 4,including:

Lot 1 33 kV Outdoor CB

● Lot 2 Reclosers

● Lot 3 Ring Main

● Lot 4 Shunt Reactors

GNPOC RAM

Mar., 2011

Jun., 2011

Sudan

5

Repair and calibration of Fighting System in CPF power plant

Supply, Delivery, Installation support and Commissioning for:

Fighting System

Petro-Energy

Apr., 2013

Apr., 2013

Sudan

6

Provision of inspection, testing and calibration for protection relay

inspection, testing and calibration for protection relay system including:

Pumping station 2

Pumping station 3&4&5&6(Typical)

Marine Terminal(6.6 KV SWGR/ 400V SWGR/MCC)

PDOC

Dec., 2014

Mar., 2015

Sudan

7

Provision of New Installation, Check, Test& Replace of the Lightning Protection System of the 33&11KV OHTL

Petro-Energy/

CPECC

Jul., 2014

Sep., 2014

Sudan