Engineering, Procurement, Construction and Commissioning (EPCC Execution)

No.

Contracts Undertaken

Client

Contract Duration

Contract Location / Country

Start Date

End Date

1

Provision of Engineering, Procurement, Construction and Commissioning (EPCC) Services for Field Surface Facilities (FSF) Project

Contract No. Petro-Energy/11/2016-9334-SO2

 Engineering, Procurement, Construction, and Commissioning  for:

● Electrical Equipment

  • 2 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray& Cable Glands& Copper cable Lugs
  • Cathodic Protection
  • Lighting

● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges& Weld Fitting& Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges & Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● Wellhead No.X1 & X2

 

Petro-Energy

Jan., 2019

Ongoing

Sudan

2

 Provision of Engineering, Procurement, Construction and Commissioning(EPCC) Services for Field Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2016-9334-SO1

 Engineering, Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 2 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Lighting
  • Surge arrester

 Type of Wellhead & Well No.:

 ● Power supply of 5 wells(FN 76-2, KEYI-11, JS-1, JS-4 and JS-7)

 ● Procurement and installation of PSS for FNE-H2

Petro-Energy

Aug., 2018

Jan., 2019

Sudan

3

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO10

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 4 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray& Cable Glands& Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges& Weld Fitting& Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges& Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● One heavy oil well in Extension of Fula OGM-8 (2 slots)

 ● Electrification works for 4 wells(JS-17, Moga-17, JS-37 & JS-38)

 ● Power Supply of 4 wells(Keyi-10, Keyi S-4, Keyi-7, Keyi-21)

Petro-Energy

Jun., 2017

Dec., 2017

Sudan

4

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO9

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 4 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● Two heavy oil wells in FNE (FNE-95 & FNE-101)

 ● Electrification work for 4 wells(Jake JS-14, JS-15, JS-22 and JS-26)

Petro-Energy

Dec., 2016

Dec., 2017

Sudan

5

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO8

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 8 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed&Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● Two heavy oil wells in FNE(FNE-79 & FNE-80) and two light oil wells in Keyi / Bara (keyi-N2 & Bara-8).

 ● Power supply of 4 wells(JS-9, JS-10, JS-34& Keyi-6)

 ● Extension of FNE OGM-7 by three slots

Petro-Energy

Apr., 2016

Dec., 2017

Sudan

6

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO7

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 14 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Lighting
  • Surge arrester

 Type of Wellhead & Well No.:

 ● Power supply for 5 wells of Keyi field (Keyi-N1, Keyi-N4, Keyi-N6, Keyi-N7, Keyi-N9)

 ● 5 sets of Power supply skid(for well No. FNE-74, FNE-76, FNE-85, FNE-86 & FNE-87)

 ● Power supply of 4 wells(for JS-29, JS-30, Moga 7 & Moga7-1)

Petro-Energy

Sep., 2015

Oct., 2016

Sudan

7

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO6

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 8 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● 4 Heavy Crude Oil Wellheads in FNE field (FNE-131, FNE-132, FNE-135, FNE-136)

 ● total 4 sets of Power Supply Skid

Petro-Energy

Mar., 2015

Feb., 2016

Sudan

8

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO5

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 11 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray, Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges

 Type of Wellhead & Well No.:

 ● 3 Heavy Crude Oil Wellheads in FN field (FN-166, FN-180, FN-76-7) and Construction of 4# flow line

 ● 4 Heavy Crude Oil Wellheads in FNE field (FNE-89, FNE-124,FNE-128, FNE-129) and Construction of 4# flow line

 ● 3 Heavy Crude Oil Wellhead in Keyi Field and 1 Heavy Crude Oil Wellhead in Bara Field (Keyi-12 with OHTL, Keyi -N10,Keyi-S6, Bara-7), including 11KV   OHTL, 11KV Underground Cable, Package Substation, etc.

Petro-Energy

Dec., 2014

Jan., 2017

Sudan

9

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO4

 Procurement, Construction, and Commissioning for:

 ● Electrical Equipment

  • 5 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● 5 Heavy Crude Oil Wellheads in FNE field(FNE-55,FNE-56,FNE-57,FNE-59,FNE-60, lift by BPU)

 ● 11KV Underground Cable from FNE-39 to FNE-41

Petro-Energy

Oct., 2014

Feb., 2016

Sudan

10

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO3

 Procurement, Construction, and Commissioning for:

 ● Electrical Equipment

  • 6 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable ,Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed&Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● 5 Heavy Crude Oil Wellheads in FNE field(FNE-66,FNE-69,FNE-70,FNE-71,FNE-73) and Construction of 4# flow line

 ● 1 OGM in FNE(OGM-7)& T/L

 ● JC-1 & JC-2 Wellhead OHTL Power Supply (including 11KV OHTL, 11KV Underground Cable, Package Substation, etc.)

 ● Power Supply of 2 wells (for Keyi 1 and Keyi 2, including 11KV OHTL, 11KV Underground Cable, Package Substation, etc.)

 ● Pig Receiver and other Facilities in FNE FPF

Petro-Energy

Sep., 2014

Jan., 2017

Sudan

11

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO2

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 6 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed&Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● 2 Heavy Crude Oil Wellheads in Fula Field(FN-149, FN-161, left by PCP)and Construction of 4# flow line

 ● 2 Medium Crude Oil Wellheads in Keyi Field (Keyi S5, Keyi-9, left by PCP)and Construction of 4# flow line

 ● 2 Water Injection Wellheads in Fula Field(FN-79, FN-90) and construction of 4# flow line

Petro-Energy

May 2014

Jan., 2015

Sudan

12

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2012/7114 SO1

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 13 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● Power Supply of 13 wells(Keyi-5, Keyi-26, Keyi-4, Keyi-8, Keyi-24, Keyi-27, Keyi-19, Keyi-3, Keyi-13, Keyi-23, Keyi-25, Keyi-S1, Keyi-S2)

 ● 4 Heavy Crude Oil Wellheads(Keyi-33, FN-148, FN-151, FN-152)

 ● 3 Water Injection Well(Keyi-18 , Keyi-28 , Keyi-30)

 ● Construction Trunk Line from Hadida Transit  Line to Keyi FPF

Petro-Energy

Jun., 2013

Dec., 2014

Sudan

13

 Provision of Procurement, Construction and Commissioning (PCC) Services for Filed Surface Facilities (FSF) Project

 Contract No. Petro-Energy/11/2011/6722

 

 Procurement, Construction, and Commissioning  for:

 ● Electrical Equipment

  • 4 units of 11KV /0.4KV Power Supply Skid
  • 8.7/15kV Termination Kits
  • Earthing Materials
  • Cable, Cable and Termination kits
  • Cable tray
  • Cable Glands
  • Copper cable Lugs
  • Cathodic Protection
  • Lighting

 ● PIPING

  • Ball Valve, Check Valve Swing, Globe Valve
  • Pipe and Hot Bend
  • Flanges
  • Weld Fitting
  • Screwed& Socket Weld Fittings
  • Gaskets and Bolts
  • Insulating Joints

 ● Instrumentation

  • Pressure Gauges
  • Temperature Gauges
  • Bulk Materials

 Type of Wellhead & Well No.:

 ● 4 Heavy Oil wellhead in FN field(FN132, FN133, FN135, FN138)

 ● Complete flow line for FN132, FN133, FN135, FN138 to OGM12

 ● Complete underground cable to the mentioned wells

 Tie-in OGM No.

 OGM12

Petro-Energy

Sep., 2012

Nov., 2013

Sudan

14

 Provision of EPCC Services for Filed Surface Facilities Phase-1(FSF1) Project

 Contract No. Staroil/55-C/2013

 WORK ORDER 01:

 Engineering, Procurement, Construction, and Commissioning  for:

 ● Power Supply of 4 wells(SN-9, SN-10, SN-11 and SN-12, including 33KV OHTL and 33KV Underground Transmission).

 ● Rerouting of SN-7 OHTL

 ● Dismantling of CSS from SN-2 and reinstall it in SN-7 with the necessary cables termination and foundation.

Staroil

Apr., 2014

Mar., 2015

Sudan

15

 Provision of EPCC Services for Filed Surface Facilities Phase-1(FSF1) Project

 Contract No. Staroil/55-C/2013

 WORK ORDER 02:

 Engineering, Procurement, Construction, and Commissioning  for:

 ●  Power Supply of 5 wells(SA-13,SA-14,SA-15,SA-16 and SA-19, including 33KV OHTL and 33KV Underground Transmission).

 ●  Power Supply of OGM-2 and OGM-3 from the nearest well.

Staroil

May 2014

May  2015

Sudan

16

 Provision of EPCC Services for Filed Surface Facilities Phase-1 (FSF1) Project

 Contract No. Staroil/55-C/2013

 WORK ORDER 03:

 Engineering, Procurement, Construction, and Commissioning  for:

 ● Power Supply of 7 wells(SA-1,SA-17,SA-2,SA-3,SA-21,SA24 and SAN-1).

Staroil

Apr., 2015

Jun., 2015

Sudan

17

 Provision of EPCC Services for Filed Surface Facilities Phase-1(FSF1) Project

 Contract No. Staroil/55-C/2013

 WORK ORDER 04:

 Engineering, Procurement, Construction, and Commissioning  for:

 ● Power Supply of 4 wells(SA-18,SA-20,SA-22,SA-23)

 ● Detailed engineering study to introduce Auto-Recloses and Sectionalizes and to enhance existing transmission systems availability and reliability.

 ● Reassessment of current environment conditions which are mandatory for power transmission systems.

 ● Develop Enhancement of really setting for each new CSS

Staroil

May  2015

May  2016

Sudan

18

 Provision EPCC Service of Moga Power Transformer Replacement

 Engineering, Procurement, Construction and Commissioning services for:

 ● Two sets of Transformer Replacement 800 KVA, 11000 Volts / 400 Volts Dyn11, ONAN

Petro-Energy

Jan., 2010

May  2010

Sudan

19

 Provision of EPCC for Power Distribution Network of South Annajma Early Production Project

 Engineering, Procurement, Construction and Commissioning services for:

 ● 33KV Power transmission line system, both Overhead Transmission(OHTL) and Underground Transmission;

 ● Power distribution System;

 ● 33KV/0.4KV Compact Substation system.

Staroil

Jan., 2012

Jul., 2012

Sudan

20

 Provision for Engineering, Procurement Service for Transmission Lines and Compact Substation for Mala North Infill Three Wells: Mala N12, Mala N13 & Mala   N17 at Mala North Field

 Engineering, Procurement services for:

 ● 33KV Power transmission line system, both Overhead Transmission(OHTL) and Underground Cable;

 ● Power distribution System;

WNPOC ZADOIL

Oct., 2011

Feb., 2012

Sudan

21

 Provision of Engineering, Procurement, Construction and Commissioning services for CCTV System of Wells in Phase 1 & Phase 2.1

 ● HD Digital cameras and poles for total 190s wells

 ● Wireless telecommunication system for Ronier CPF/Mimosa FPF/ Baobab FPF

 ● CCTV system for BAOBAB CAMP/OGM 4/OGM 10/Phoenix OGM/ Ronier Camp

CNPC International (Chad) Co.,Ltd.

Oct., 2018

Ongoing

Chad

22

 Provision of EPCC service for CCTV System & Lighting Enhancement Project for JAKE FPF, JAKE CAMP, KEYI FPF and KEYI CAMP

 Engineering, Procurement, Construction and Commissioning services for:

 ● CCTV System

 ● Lighting System

 ● Earthing network System

Petro-Energy

Jun., 2012

Jun., 2013

Sudan

23

 Provision of Procurement, Construction and Commissioning Services for ELECTRICAL & INSTRUMENTATION portion of Keyi Field Production Facility (FPF)

 

 Scope of Work

 Procurement, Construction and Commissioning Services for:

 ● Electrical Equipment

  • DCS Control System
  • 400V MCC
  • UPS
  • FIRE&GAS DETECTOR
  • Distribution Transformer
  • Earthing Materials
  • EDG
  • Cable ,Cable end Termination kits
  • Cable tray
  • Heat tracing System
  • Junction Boxes
  • Distribution Board
  • Local Control Station

 ● Instrumentation and Controls

  • Safety System (ESD and F&G)
  • ESD Valves
  • Pressure safety  Valves
  • Vacuum Relief Valves
  • Rupture Disc
  • Pressure & Differential Pressure Gauges
  • Temperature gauge
  • Flow(restriction) orifice and Differential Pressure Transmitter(Gauges)
  • Coriolis mass flowmeters
  • Flow meter (Wedgemeter)
  • Electromagnetic Flowmeter
  • Turbine flowmeter
  • Magnetic Level gauge
  • Radar Type  Level Transmitter
  • Level Transmitter Displacer Type

Petro-Energy
ASAWER

Dec., 2009

Dec., 2010

Sudan

24

 Provision of EPCC of installation of Tele-Control Project (Remote Terminal Unit) – Phase I

 Procurement, Construction, and Commissioning  for:

 ● Wireless communication system

  • 18 Sets Mesh Backbone radio for Neem Area, Baoboo Area and Heglig Area
  • 140 Sets Mesh Remote Access station radio for Neem Area, Baoboo Area and Heglig Area

 ● RTU system:

  • 140 Sets wellhead RTU system for Neem Area, Baoboo Area and Heglig Area

 ● Master RTU  system

  • 3 set Master RTU for Neem FPF, Bamboo FPF, Heglig FPF

GNPOC

Mar., 2016

Feb., 2018

Sudan

25

 Provision of replacing Control System (SCS) at pumping stations & pipeline SCADA for BAPCO Pipeline facilities

 Scope of Work

 ● Station Control System for total 5 Pumping Stations( PS#2 PS#3  PS#4 PS#5 PS#6)

 ● Pipeline SCADA Systems for CPF, PS#1 to PS#6, MC, HQ, MT KOSTI metering station & KRC metering station and SCADA Center

 ● SCADA system and RTU equipment for 7 BV Stations

 ●Cathodic Protection Management system for 5 Pump stations(PS#2~PS#6), CPF, MT, MCC and 10 BV stations.

BAPCO

Jul., 2018

Ongoing

Sudan